Wandoo Reintegration Facility is WA’s first dedicated Alcohol and other Drug rehabilitation prison for women in custody. Built over two levels, Wandoo’s gatehouse hosts a security control room, hold and search rooms, a security screening area and officer posts.

Design3 were engaged by ADCO Constructions to provide a full 3D model and associated fabrication drawings (almost 1000 drawings) for all of the steel work. Also, cast in plate set out drawings were completed by Design3 for the concrete pre-cast panels and all cast in steel columns throughout the project.

Construction cost: $10M

Completion: late 2018